When designing a home, the homeowner’s domestic culture, needs, and economic circumstances must be considered. Once a design is complete, the materials and manpower are prepared, and the construction is accomplished according to that design. In Korea, home construction is generally performed in the following sequence: design and construction preparations, foundation and stylobate construction, wooden frame assembly, roof construction, and repair and finishing work.
1. Design and construction preparations: In the modern era, when a building is constructed, the owner first selects an architect. Then, the owner asks the architect to create a blueprint that is suitable for the prepared site and selects a contractor to begin construction based on the blueprint. In the past, there was no clear distinction between the architect and the contractor. That is, in the traditional method, a daemokjang (construction of large structures or a carpenter who specialized in such work) designed and constructed homes.
2. Foundation and stylobate construction: House construction begins with groundbreaking rites and site excavation work. Once the site is prepared for the building, the foundation work is performed. First, the plinths for the columns are placed on the compacted ground. The task of cutting or processing the construction materials is done before assembly work; therefore, it is done at the same time as the foundation work. In the past, when wood was used as a construction material, it was cut and processed from a raw log state, but nowadays, the primary work is generally done at a lumber mill, while a carpenter does the secondary work. Assembly of wooden structures begins after 70 – 80% of the wooden members that will be used in the building are cut or processed.
3. Wooden frame assembly: The assembly of traditional Korean houses begins with building the stylobate, placing the column plinths on top of the stylobate, and erecting the columns. The task of erecting the columns varies according to the size of the house. In the case of small private houses, it is done simultaneously with the placement of the plinths. Once the building’s major furnishing material has been assembled, the sangnyangsik is performed. The task of building the house’s framework by erecting the columns and placing the beams (thick pieces of wood that are placed horizontally between columns) atop the columns is called sangnyang; thus, the associated ritual is called the sangnyangsik. After the ritual is performed, the craftsmen hang the rafters, install the roof tiles, lay down the maru (wooden floor), decorate the walls, install the gudeul (floor heating), and install the windows.
4. Roof construction: The skilled workers responsible for hanging the rafters and installing the roof tiles are not the same people. The people who install roof tiles are called wagong, a term that originally referred to a person who makes roof tiles but now refers to a person who performs any work related to roof tiles. When roofing work is performed on a traditional building, the carpenters and wagong inspect the work from both near and far to examine the building’s harmony with nearby buildings and landscape as well as the personality and disposition of the building owner.
5. Finishing work and interior work: Finishing work is performed after the tiles are placed on the roof. It refers to a sequential process in which the walls are decorated, the gudeul and maru are put down, and the windows and handrails are installed. Interior work is performed throughout the building and consists of plastering, electrical work, and indoor ondol (floor heating) work.